Thursday, 6 November 2008

Surface Mapping





Measurements taken from the surface of the lead and concrete by using the measuring device were plotted against grids that were shifted at every 10mm intervals. These drawings are showing the construction sequence of the lead formwork and the concrete cast in detail.

1 comment:

Jonathan Dawes said...

this is starting to look like an elegant drawing- I am interested in the relationship between the object and the implied cube. I am looking forward to see a composite reading of the surface characteristics, and how changes in axial reference (the process of the making) are represented